1.1 A bill for an act
1.2 relating to energy; requiring
spent fuel located at Prairie Island to be transferred
1.3 to another site for storage;
authorizing additional storage to be constructed at the
1.4 Monticello nuclear generating
plant; authorizing the public utility to withhold
1.5 money from the renewable
development account to pay for the cost to transport
1.6 spent fuel;amending Minnesota
Statutes 2024, sections 116C.771; 116C.777;
1.7 116C.779, subdivision 1, by
adding a subdivision; repealing Minnesota Statutes
1.8 2024, sections 116C.779,
subdivision 2; 216C.41.
1.9 BE IT ENACTED BY THE
LEGISLATURE OF THE STATE OF MINNESOTA:
1.10 Section 1. Minnesota Statutes
2024, section 116C.771, is amended to read:
1.11 116C.771 ADDITIONAL CASK
LIMITATIONS.
1.12 (a) Five casks may be
filled and used at Prairie Island on May 11, 1994.
1.13 (b) An additional four casks
may be filled and used at Prairie Island if the Environmental
1.14 Quality Board determines that,
by December 31, 1996, the public utility operating the Prairie
1.15 Island plant has filed a
license application with the United States Nuclear Regulatory
1.16 Commission for a spent nuclear
fuel storage facility off of Prairie Island in Goodhue County,
1.17 is continuing to make a good
faith effort to implement the site, and has constructed,
1.18 contracted for construction and
operation, or purchased installed capacity of 100 megawatts
1.19 of wind power in addition to
wind power under construction or contract on May 11, 1994.
1.20 (c)(1) An additional eight
casks may be filled and placed at Prairie Island if the legislature
1.21 has not revoked the
authorization under clause (2) or the public utility has satisfied the wind
1.22 power and biomass mandate
requirements in sections 216B.2423, subdivision 1, paragraph
1.23 (a), clause (1), and 216B.2424,
subdivision 5, paragraph (a), clause (1), and the alternative
1.24 site in Goodhue County is
operational or under construction.
2.1 (2) If the site is not under
construction or operational or the wind mandates are not
2.2 satisfied, the legislature
may revoke the authorization for the additional eight casks by a
2.3 law enacted prior to June 1,
1999.
2.4 (d) Except as provided
under paragraph (e), dry cask storage capacity for high-level
2.5 nuclear waste within
the state may not be increased beyond the casks authorized by section
2.6 116C.77 or their
equivalent storage capacity.
2.7 (e) (d)
This section does not prohibit a public utility from applying for or the Public
2.8 Utilities Commission from
granting a certificate of need for dry cask storage to accommodate
2.9 the decommissioning of a
nuclear power plant within this state.
2.10 (e) An additional spent fuel
storage facility must be constructed at the Monticello nuclear
2.11 generating plant to
store spent nuclear fuel transferred from the Prairie Island nuclear
2.12 generating plant.
2.13 Sec. 2. Minnesota Statutes
2024, section 116C.777, is amended to read:
2.14 116C.777 SITE.
2.15 By January 1, 2028, the
spent fuel contents of dry casks located on Prairie Island must
2.16 be moved immediately
upon the availability of another site for storage of the spent fuel that
2.17 is not located on Prairie
Island or at Monticello.
2.18 Sec. 3. Minnesota Statutes
2024, section 116C.779, subdivision 1, is amended to read:
2.19 Subdivision 1.Renewable
development account. (a) The renewable development
2.20 account is established as a
separate account in the special revenue fund in the state treasury.
2.21 Appropriations and transfers to
the account shall be credited to the account. Earnings, such
2.22 as interest, dividends, and any
other earnings arising from assets of the account, shall be
2.23 credited to the account. Funds
remaining in the account at the end of a fiscal year are not
2.24 canceled to the general fund
but remain in the account until expended. The account shall
2.25 be administered by the
commissioner of management and budget as provided under this
2.26 section.
2.27 (b) On July 1, 2017, the
public utility that owns the Prairie Island nuclear generating
2.28 plant must transfer all
funds in the renewable development account previously established
2.29 under this subdivision
and managed by the public utility to the renewable development
2.30 account established in
paragraph (a). Funds awarded to grantees in previous grant cycles
2.31 that have not yet been
expended and unencumbered funds required to be paid in calendar
3.1 year 2017 under
paragraphs (f) and (g), and sections 116C.7792 and 216C.41, are not subject
3.2 to transfer under this
paragraph.
3.3 (c) (b)
Except as provided in subdivision 1a, beginning January 15, 2018, and
continuing
3.4 each January 15 thereafter,
the public utility that owns the Prairie Island nuclear generating
3.5 plant must transfer to the
renewable development account $500,000 each year for each dry
3.6 cask containing spent fuel
that is located at the Prairie Island power plant for each year the
3.7 plant is in operation, and
$7,500,000 each year the plant is not in operation if ordered by
3.8 the commission pursuant to
paragraph (i) (e). The fund transfer must be made if nuclear
3.9 waste is stored in a dry cask
at the independent spent-fuel storage facility at Prairie Island
3.10 for any part of a year. The
total amount transferred annually under this paragraph must be
3.11 reduced by $3,750,000.
3.12 (d) (c) Except as
provided in subdivision 1a, beginning January 15, 2018, and continuing
3.13 each January 15 thereafter
until January 15, 2028, the public utility that owns the Monticello
3.14 nuclear generating plant must
transfer to the renewable development account $350,000 each
3.15 year for each dry cask
containing spent fuel that is located at the Monticello nuclear power
3.16 plant for each year the plant
is in operation, and $5,250,000 each year the plant is not in
3.17 operation if ordered by the
commission pursuant to paragraph (i) (e). The fund transfer must
3.18 be made if nuclear waste is
stored in a dry cask at the independent spent-fuel storage facility
3.19 at Monticello for any part of a
year.
3.20 (e) (d) Each
year, the public utility shall withhold from the funds transferred to the
3.21 renewable development account
under paragraphs (b) and (c) and (d) the amount necessary
3.22 to pay its obligations under paragraphs
(f) and (g), and sections section116C.7792and
3.23 216C.41, for that
calendar year.
3.24 (f) If the commission
approves a new or amended power purchase agreement, the
3.25 termination of a power
purchase agreement, or the purchase and closure of a facility under
3.26 section 216B.2424,
subdivision 9, with an entity that uses poultry litter to generate electricity,
3.27 the public utility
subject to this section shall enter into a contract with the city in which the
3.28 poultry litter plant is
located to provide grants to the city for the purposes of economic
3.29 development on the
following schedule: $4,000,000 in fiscal year 2018; $6,500,000 each
3.30 fiscal year in 2019 and
2020; and $3,000,000 in fiscal year 2021. The grants shall be paid
3.31 by the public utility
from funds withheld from the transfer to the renewable development
3.32 account, as provided in
paragraphs (b) and (e).
3.33 (g) If the commission
approves a new or amended power purchase agreement, or the
3.34 termination of a power
purchase agreement under section 216B.2424, subdivision 9, with
4.1 an entity owned or
controlled, directly or indirectly, by two municipal utilities located north
4.2 of Constitutional
Route No. 8, that was previously used to meet the biomass mandate in
4.3 section 216B.2424, the
public utility that owns a nuclear generating plant shall enter into a
4.4 grant contract with
such entity to provide $6,800,000 per year for five years, commencing
4.5 30 days after the
commission approves the new or amended power purchase agreement, or
4.6 the termination of the
power purchase agreement, and on each June 1 thereafter through
4.7 2021, to assist the
transition required by the new, amended, or terminated power purchase
4.8 agreement. The grant shall
be paid by the public utility from funds withheld from the transfer
4.9 to the renewable
development account as provided in paragraphs (b) and (e).
4.10 (h) The collective
amount paid under the grant contracts awarded under paragraphs (f)
4.11 and (g) is limited to
the amount deposited into the renewable development account, and its
4.12 predecessor, the
renewable development account, established under this section, that was
4.13 not required to be
deposited into the account under Laws 1994, chapter 641, article 1, section
4.14 10.
4.15 (i) (e) After
discontinuation of operation of the Prairie Island nuclear plant or the
4.16 Monticello nuclear plant and
each year spent nuclear fuel is stored in dry cask at the
4.17 discontinued facility, the
commission shall require the public utility to pay $7,500,000 for
4.18 the discontinued Prairie Island
facility and $5,250,000 for the discontinued Monticello
4.19 facility for any year in which
the commission finds, by the preponderance of the evidence,
4.20 that the public utility did not
make a good faith effort to remove the spent nuclear fuel stored
4.21 at the facility to a permanent
or interim storage site out of the state. This determination shall
4.22 be made at least every two years.
4.23 (j) (f) Funds in
the account may be expended only for any of the following purposes:
4.24 (1) to stimulate research and
development of renewable electric energy technologies;
4.25 (2) to encourage grid
modernization, including, but not limited to, projects that implement
4.26 electricity storage, load
control, and smart meter technology; and
4.27 (3) to stimulate other
innovative energy projects that reduce demand and increase system
4.28 efficiency and flexibility.
4.29 Expenditures from the fund must
benefit Minnesota ratepayers receiving electric service
4.30 from the utility that owns a
nuclear-powered electric generating plant in this state or the
4.31 Prairie Island Indian community
or its members.
4.32 The utility that owns a nuclear
generating plant is eligible to apply for grants under this
4.33 subdivision.
5.1 (k) (g) For the
purposes of paragraph (j) (f), the following terms have the
meanings
5.2 given:
5.3 (1) "renewable" has
the meaning given in section 216B.2422, subdivision 1, paragraph
5.4 (c), clauses (1), (2), (4),
and (5); and
5.5 (2) "grid
modernization" means:
5.6 (i) enhancing the reliability
of the electrical grid;
5.7 (ii) improving the security
of the electrical grid against cyberthreats and physical threats;
5.8 and
5.9 (iii) increasing energy
conservation opportunities by facilitating communication between
5.10 the utility and its customers
through the use of two-way meters, control technologies, energy
5.11 storage and microgrids,
technologies to enable demand response, and other innovative
5.12 technologies.
5.13 (l) A renewable development
account advisory group that includes, among others,
5.14 representatives of the
public utility and its ratepayers, and includes at least one representative
5.15 of the Prairie Island
Indian community appointed by that community's tribal council, shall
5.16 develop recommendations
on account expenditures. The advisory group must design a
5.17 request for proposal and
evaluate projects submitted in response to a request for proposals.
5.18 The advisory group must
utilize an independent third-party expert to evaluate proposals
5.19 submitted in response to
a request for proposal, including all proposals made by the public
5.20 utility. A request for
proposal for research and development under paragraph (j), clause (1),
5.21 may be limited to or
include a request to higher education institutions located in Minnesota
5.22 for multiple projects
authorized under paragraph (j), clause (1). The request for multiple
5.23 projects may include a
provision that exempts the projects from the third-party expert review
5.24 and instead provides for
project evaluation and selection by a merit peer review grant system.
5.25 In the process of
determining request for proposal scope and subject and in evaluating
5.26 responses to request for
proposals, the advisory group must strongly consider, where
5.27 reasonable:
5.28 (1) potential benefit to
Minnesota citizens and businesses and the utility's ratepayers;
5.29 and
5.30 (2) the proposer's
commitment to increasing the diversity of the proposer's workforce
5.31 and vendors.
5.32 (m) The advisory group
shall submit funding recommendations to the public utility,
5.33 which has full and sole
authority to determine which expenditures shall be submitted by
6.1 the advisory group to
the legislature. The commission may approve proposed expenditures,
6.2 may disapprove
proposed expenditures that it finds not to be in compliance with this
6.3 subdivision or
otherwise not in the public interest, and may, if agreed to by the public
utility,
6.4 modify proposed
expenditures. The commission shall, by order, submit its funding
6.5 recommendations to the
legislature as provided under paragraph (n).
6.6 (n) The commission
shall present its recommended appropriations from the account to
6.7 the senate and house
of representatives committees with jurisdiction over energy policy and
6.8 finance annually by
February 15. Expenditures from the account must be appropriated by
6.9 law. In enacting
appropriations from the account, the legislature:
6.10 (1) may approve or
disapprove, but may not modify, the amount of an appropriation for
6.11 a project recommended by
the commission; and
6.12 (2) may not appropriate
money for a project the commission has not recommended
6.13 funding.
6.14 (o) A request for
proposal for renewable energy generation projects must, when feasible
6.15 and reasonable, give
preference to projects that are most cost-effective for a particular energy
6.16 source.
6.17 (p) The advisory group
must annually, by February 15, report to the chairs and ranking
6.18 minority members of the
legislative committees with jurisdiction over energy policy on
6.19 projects funded by the
account for the prior year and all previous years. The report must,
6.20 to the extent possible
and reasonable, itemize the actual and projected financial benefit to
6.21 the public utility's
ratepayers of each project.
6.22 (q) (h) A
project receiving funds from the account must produce a written final report
6.23 that includes sufficient detail
for technical readers and a clearly written summary for
6.24 nontechnical readers. The
report must include an evaluation of the project's financial,
6.25 environmental, and other
benefits to the state and the public utility's ratepayers. A project
6.26 receiving funds from the
account must submit a report that meets the requirements of section
6.27 216C.51, subdivisions 3 and 4,
each year the project funded by the account is in progress.
6.28 (r) (i) Final
reports, any mid-project status reports, and renewable development account
6.29 financial reports must be
posted online on a public website designated by the commissioner
6.30 of commerce.
6.31 (s) (j) All final
reports must acknowledge that the project was made possible in whole
6.32 or part by the Minnesota
renewable development account, noting that the account is financed
6.33 by the public utility's
ratepayers.
7.1 (t) (k) Of the
amount in the renewable development account, priority must be given to
7.2 making the payments required
under section 216C.417.
7.3 (u) (l)
Construction projects receiving funds from this account are subject to the
7.4 requirement to pay the
prevailing wage rate, as defined in section 177.42 and the requirements
7.5 and enforcement provisions in
sections 177.27, 177.30, 177.32, 177.41 to 177.435, and
7.6 177.45.
7.7 Sec. 4. Minnesota Statutes
2024, section 116C.779, is amended by adding a subdivision
7.8 to read:
7.9 Subd. 4.Costs
to transport spent nuclear fuel. Each year, the public utility that
owns
7.10 the Prairie Island nuclear
generating plant must withhold from the money transferred to the
7.11 renewable development
account under subdivision 1, paragraphs (b) and (c), the amount
7.12 necessary to pay for the
costs to transport spent nuclear fuel, including the spent nuclear
7.13 fuel stored in casks
under sections 116C.77 and 116C.771, from the Prairie Island nuclear
7.14 generating plant to the
Monticello nuclear generating plant.
7.15 Sec. 5. REPEALER.
7.16 Minnesota Statutes 2024, sections 116C.779, subdivision 2;
and 216C.41, are repealed.
APPENDIX
Repealed Minnesota Statutes:
25-05137
116C.779 FUNDING FOR RENEWABLE DEVELOPMENT.Subd. 2.Renewable energy
production incentive.
(a) Until January 1, 2021, $10,900,000
annually must be allocated from available funds in the account to fund
renewable energy production incentives. $9,400,000 of this annual amount is for
incentives for electricity generated by wind energy conversion systems that are
eligible for the incentives under section 216C.41 or Laws 2005, chapter 40.
(b) The balance of this amount, up
to $1,500,000 annually, may be used for production incentives for on-farm
biogas recovery facilities and hydroelectric facilities that are eligible for
the incentive under section 216C.41 or for production incentives for other
renewables, to be provided in the same manner as under section 216C.41.
(c) Any portion of the $10,900,000
not expended in any calendar year for the incentive is available for other
spending purposes under subdivision 1. This subdivision does not create an
obligation to contribute funds to the account.
(d) The Department of Commerce
shall determine eligibility of projects under section 216C.41 for the purposes
of this subdivision. At least quarterly, the Department of Commerce shall
notify the public utility of the name and address of each eligible project
owner and the amount due to each project under section 216C.41. The public
utility shall make payments within 15 working days after receipt of
notification of payments due.
216C.41 RENEWABLE ENERGY PRODUCTION INCENTIVE.Subdivision 1.Definitions.
(a) The definitions in this
subdivision apply to this section.
(b) "Qualified hydroelectric
facility" means a hydroelectric generating facility in this state that:
(1) is located at the site of a
dam, if the dam was in existence as of March 31, 1994; and
(2) begins generating electricity
after July 1, 1994, or generates electricity after substantial refurbishing of
a facility that begins after July 1, 2001.
(c) "Qualified wind energy
conversion facility" means a wind energy conversion system in this state
that:
(1) produces two megawatts or less
of electricity as measured by nameplate rating and begins generating
electricity after December 31, 1996, and before July 1, 1999;
(2) begins generating electricity
after June 30, 1999, produces two megawatts or less of electricity as measured
by nameplate rating, and is:
(i) owned by a resident of
Minnesota or an entity that is organized under the laws of this state, is not
prohibited from owning agricultural land under section 500.24, and owns the
land where the facility is sited;
(ii) owned by a Minnesota small
business as defined in section 645.445;
(iii) owned by a Minnesota
nonprofit organization;
(iv) owned by a tribal council if
the facility is located within the boundaries of the reservation;
(v) owned by a Minnesota municipal
utility or a Minnesota cooperative electric association; or
(vi) owned by a Minnesota political
subdivision or local government, including, but not limited to, a county,
statutory or home rule charter city, town, school district, or any other local
or regional governmental organization such as a board, commission, or
association; or
(3) begins generating electricity
after June 30, 1999, produces seven megawatts or less of electricity as
measured by nameplate rating, and:
(i) is owned by a cooperative
organized under chapter 308A other than a Minnesota cooperative electric
association; and
(ii) all shares and membership in
the cooperative are held by an entity that is not prohibited from owning
agricultural land under section 500.24.
(d) "Qualified on-farm biogas
recovery facility" means an anaerobic digester system that:
(1) is located at the site of an
agricultural operation; and
(2) is owned by an entity that is
not prohibited from owning agricultural land under section 500.24 and that owns
or rents the land where the facility is located.
(e) "Anaerobic digester
system" means a system of components that processes animal waste based on
the absence of oxygen and produces gas used to generate electricity.
Subd. 2.Incentive payment; appropriation.
(a) Incentive payments must be made
according to this section to (1) a qualified on-farm biogas recovery facility,
(2) the owner or operator of a qualified hydropower facility or qualified wind
energy conversion facility for electric energy generated and sold by the
facility, (3) a publicly owned hydropower facility for electric energy that is
generated by the facility and used by the owner of the facility outside the
facility, or (4) the owner of a publicly owned dam that is in need of
substantial repair, for electric energy that is generated by a hydropower
facility at the dam and the annual incentive payments will be used to fund the
structural repairs and replacement of structural components of the dam, or to
retire debt incurred to fund those repairs.
(b) Payment may only be made upon
receipt by the commissioner of commerce of an incentive payment application
that establishes that the applicant is eligible to receive an incentive payment
and that satisfies other requirements the commissioner deems necessary. The
application must be in a form and submitted at a time the commissioner
establishes.
(c) There is annually appropriated
from the renewable development account under section 116C.779 to the
commissioner of commerce sums sufficient to make the payments required under
this section, in addition to the amounts funded by the renewable development
account as specified in subdivision 5a.
Subd. 3.Eligibility window.
Payments may be made under this
section only for:
(a) electricity generated from:
(1) a qualified hydroelectric
facility that is operational and generating electricity before December 31,
2011;
(2) a qualified wind energy
conversion facility that is operational and generating electricity before
January 1, 2008; or
(3) a qualified on-farm biogas
recovery facility from July 1, 2001, through December 31, 2017; and
(b) gas generated from a qualified
on-farm biogas recovery facility from July 1, 2007, through December 31, 2017.
Subd. 4.Payment period.
(a) A facility may receive payments
under this section for a ten-year period. No payment under this section may be
made for electricity generated:
(1) by a qualified hydroelectric facility
after December 31, 2021;
(2) by a qualified wind energy
conversion facility after December 31, 2018; or
(3) by a qualified on-farm biogas
recovery facility after December 31, 2017.
(b) The payment period begins and
runs consecutively from the date the facility begins generating electricity or,
in the case of refurbishment of a hydropower facility, after substantial
repairs to the hydropower facility dam funded by the incentive payments are
initiated.
Subd. 5.Amount of payment; wind facilities limit.
(a) An incentive payment is based
on the number of kilowatt-hours of electricity generated. The amount of the
payment is:
(1) for a facility described under
subdivision 2, paragraph (a), clause (4), 1.0 cent per kilowatt-hour; and
(2) for all other facilities, 1.5
cents per kilowatt-hour.
For electricity generated by
qualified wind energy conversion facilities, the incentive payment under this
section is limited to no more than 200 megawatts of nameplate capacity.
(b) For wind energy conversion
systems installed and contracted for after January 1, 2002, the total size of a
wind energy conversion system under this section must be determined according
to this paragraph. Unless the systems are interconnected with different
distribution systems, the nameplate capacity of one wind energy conversion
system must be combined with the nameplate capacity of any other wind energy
conversion system that is:
(1) located within five miles of
the wind energy conversion system;
(2) constructed within the same
calendar year as the wind energy conversion system; and
(3) under common ownership.
In the case of a dispute, the
commissioner of commerce shall determine the total size of the system, and
shall draw all reasonable inferences in favor of combining the systems.
(c) In making a determination under
paragraph (b), the commissioner of commerce may determine that two wind energy
conversion systems are under common ownership when the underlying ownership
structure contains similar persons or entities, even if the ownership shares
differ between the two systems. Wind energy conversion systems are not under
common ownership solely because the same person or entity provided equity
financing for the systems.
Subd. 5a.Renewable development account.
The Department of Commerce shall
authorize payment of the renewable energy production incentive to wind energy
conversion systems that are eligible under this section or Laws 2005, chapter
40, to on-farm biogas recovery facilities, and to hydroelectric facilities.
Payment of the incentive shall be made from the renewable energy development
account as provided under section 116C.779, subdivision 2.
Subd. 6.Ownership; financing; cure.
(a) For the purposes of subdivision
1, paragraph (c), clause (2), a wind energy conversion facility qualifies if it
is owned at least 51 percent by one or more of any combination of the entities
listed in that clause.
(b) A subsequent owner of a
qualified facility may continue to receive the incentive payment for the
duration of the original payment period if the subsequent owner qualifies for
the incentive under subdivision 1.
(c) Nothing in this section may be
construed to deny incentive payment to an otherwise qualified facility that has
obtained debt or equity financing for construction or operation as long as the
ownership requirements of subdivision 1 and this subdivision are met. If,
during the incentive payment period for a qualified facility, the owner of the
facility is in default of a lending agreement and the lender takes possession
of and operates the facility and makes reasonable efforts to transfer ownership
of the facility to an entity other than the lender, the lender may continue to
receive the incentive payment for electricity generated and sold by the
facility for a period not to exceed 18 months. A lender who takes possession of
a facility shall notify the commissioner immediately on taking possession and,
at least quarterly, document efforts to transfer ownership of the facility.
(d) If, during the incentive
payment period, a qualified facility loses the right to receive the incentive
because of changes in ownership, the facility may regain the right to receive
the incentive upon cure of the ownership structure that resulted in the loss of
eligibility and may reapply for the incentive, but in no case may the payment
period be extended beyond the original ten-year limit.
(e) A subsequent or requalifying
owner under paragraph (b) or (d) retains the facility's original priority order
for incentive payments as long as the ownership structure requalifies within
two years from the date the facility became unqualified or two years from the
date a lender takes possession.
Subd. 7.Eligibility process.
(a) A qualifying project is
eligible for the incentive on the date the commissioner receives:
(1) an application for payment of
the incentive;
(2) one of the following:
(i) a copy of a signed power
purchase agreement;
(ii) a copy of a binding agreement
other than a power purchase agreement to sell electricity generated by the
project to a third person; or
(iii) if the project developer or
owner will sell electricity to its own members or customers, a copy of the
purchase order for equipment to construct the project with a delivery date and
a copy of a signed receipt for a nonrefundable deposit; and
(3) any other information the
commissioner deems necessary to determine whether the proposed project
qualifies for the incentive under this section.
(b) The commissioner shall
determine whether a project qualifies for the incentive and respond in writing
to the applicant approving or denying the application within 15 working days of
receipt of the information required in paragraph (a). A project that is not
operational within 18 months of receipt of a letter of approval is no longer
approved for the incentive. The commissioner shall notify an applicant of
potential loss of approval not less than 60 days prior to the end of the
18-month period. Eligibility for a project that loses approval may be
reestablished as of the date the commissioner receives a new completed
application.