1.1 A bill for an act
1.2 relating to taxation; sales
and use; repealing the exemption for data centers;
1.3 repealing the contingent
reduction in special education aid appropriations;amending
1.4 Minnesota Statutes 2024,
section 216B.02, by adding a subdivision; Minnesota
1.5 Statutes 2025 Supplement,
sections 216B.02, subdivision 12; 297A.75, subdivisions
1.6 1, 2, 3; repealing Minnesota
Statutes 2025 Supplement, section 297A.68,
1.7 subdivision 42; Laws 2025,
First Special Session chapter 10, article 7, section 8.
1.8 BE IT ENACTED BY THE
LEGISLATURE OF THE STATE OF MINNESOTA:
1.9 Section 1. Minnesota Statutes
2025 Supplement, section 216B.02, subdivision 12, is
1.10 amended to read:
1.11 Subd. 12.Qualified
large-scale data center. "Qualified large-scale data center" has
the
1.12 meaning given in section
297A.68, subdivision 42, paragraph (e). means a facility in
1.13 Minnesota:
1.14 (1) that is comprised of
one or more buildings connected to each other by fiber and
1.15 associated equipment
that consist in the aggregate of at least 25,000 square feet, and that
1.16 are located in one
physical location or multiple locations; and
1.17 (2) for which the total
cost of construction or refurbishment, investment in enterprise
1.18 information technology
equipment, and computer software is at least $250,000,000
1.19 collectively by the
facility and its tenants within a 60-month period beginning after June
1.20 30, 2025.
1.21 EFFECTIVE DATE. This
section is effective July 1, 2026.
2.1 Sec. 2. Minnesota Statutes
2024, section 216B.02, is amended by adding a subdivision to
2.2 read:
2.3 Subd. 13.Enterprise
information technology equipment. "Enterprise information
2.4 technology
equipment" means computers and equipment supporting computing, networking,
2.5 or data storage,
including servers and routers necessary for the maintenance and operation
2.6 of the qualified
large-scale data centers.
2.7 EFFECTIVE DATE.
This section is effective July 1, 2026.
2.8 Sec. 3. Minnesota Statutes
2025 Supplement, section 297A.75, subdivision 1, is amended
2.9 to read:
2.10 Subdivision 1.Tax
collected. The tax on the gross receipts from the sale of the following
2.11 exempt items must be imposed
and collected as if the sale were taxable and the rate under
2.12 section 297A.62, subdivision 1,
applied. The exempt items include:
2.13 (1) building materials for an
agricultural processing facility exempt under section
2.14 297A.71, subdivision 13;
2.15 (2) building materials for
mineral production facilities exempt under section 297A.71,
2.16 subdivision 14;
2.17 (3) building materials for
correctional facilities under section 297A.71, subdivision 3;
2.18 (4) building materials used in
a residence for veterans with a disability exempt under
2.19 section 297A.71, subdivision
11;
2.20 (5) elevators and building
materials exempt under section 297A.71, subdivision 12;
2.21 (6) materials and supplies for
qualified low-income housing under section 297A.71,
2.22 subdivision 23;
2.23 (7) materials, supplies, and
equipment for municipal electric utility facilities under
2.24 section 297A.71, subdivision
35;
2.25 (8) equipment and materials
used for the generation, transmission, and distribution of
2.26 electrical energy and an aerial
camera package exempt under section 297A.68, subdivision
2.27 37;
2.28 (9) commuter rail vehicle and
repair parts under section 297A.70, subdivision 3, paragraph
2.29 (a), clause (10);
2.30 (10) materials, supplies, and
equipment for construction or improvement of projects and
2.31 facilities under section
297A.71, subdivision 40;
3.1 (11) enterprise
information technology equipment and computer software for use in a
3.2 qualified data center,
qualified large-scale data center, or qualified refurbished data center
3.3 exempt under section
297A.68, subdivision 42;
3.4 (12) (11)
materials, supplies, and equipment for qualifying capital projects under
section
3.5 297A.71, subdivision 44,
paragraphs (a) and (b);
3.6 (13) (12) items
purchased for use in providing critical access dental services exempt
3.7 under section 297A.70,
subdivision 7, paragraph (c);
3.8 (14) (13) items
and services purchased under a business subsidy agreement for use or
3.9 consumption primarily in
greater Minnesota exempt under section 297A.68, subdivision
3.10 44;
3.11 (15) (14)
building materials, equipment, and supplies for constructing or replacing real
3.12 property exempt under section
297A.71, subdivisions 49; 50, paragraph (b); and 51;
3.13 (16) (15)
building materials, equipment, and supplies for qualifying capital projects
3.14 under section 297A.71,
subdivision 52;
3.15 (17) (16)
building materials, equipment, and supplies for constructing, remodeling,
3.16 expanding, or improving a fire
station, police station, or related facilities exempt under
3.17 section 297A.71, subdivision
53; and
3.18 (18) (17)
building materials, equipment, and supplies for constructing, remodeling, or
3.19 improving a sustainable
aviation fuel facility exempt under section 297A.71, subdivision
3.20 54.
3.21 EFFECTIVE DATE. This
section is effective July 1, 2026.
3.22 Sec. 4. Minnesota Statutes 2025
Supplement, section 297A.75, subdivision 2, is amended
3.23 to read:
3.24 Subd. 2.Refund;
eligible persons. Upon application on forms prescribed by the
3.25 commissioner, a refund equal to
the tax paid on the gross receipts of the exempt items must
3.26 be paid to the applicant. Only
the following persons may apply for the refund:
3.27 (1) for subdivision 1, clauses
(1), (2), and (13) (12), the applicant must be the purchaser;
3.28 (2) for subdivision 1, clause
(3), the applicant must be the governmental subdivision;
3.29 (3) for subdivision 1, clause
(4), the applicant must be the recipient of the benefits
3.30 provided in United States Code,
title 38, chapter 21;
4.1 (4) for subdivision 1, clause
(5), the applicant must be the owner of the homestead
4.2 property;
4.3 (5) for subdivision 1, clause
(6), the owner of the qualified low-income housing project;
4.4 (6) for subdivision 1, clause
(7), the applicant must be a municipal electric utility or a
4.5 joint venture of municipal
electric utilities;
4.6 (7) for subdivision 1,
clauses (8), (11), and (14) (13), the owner of the
qualifying business;
4.7 (8) for subdivision 1,
clauses (9), (10), (12), (16), and (17) (11), (15), and (16), the
4.8 applicant must be the
governmental entity that owns or contracts for the project or facility;
4.9 (9) for subdivision 1, clause
(15) (14), the applicant must be the owner or developer of
4.10 the building or project; and
4.11 (10) for subdivision 1, clause (18)
(17), the applicant must be the owner or developer
4.12 of the sustainable aviation
fuel facility.
4.13 EFFECTIVE DATE. This
section is effective July 1, 2026.
4.14 Sec. 5. Minnesota Statutes 2025
Supplement, section 297A.75, subdivision 3, is amended
4.15 to read:
4.16 Subd. 3.Application.
(a) The application must include sufficient information to permit
4.17 the commissioner to verify the
tax paid. If the tax was paid by a contractor, subcontractor,
4.18 or builder, under subdivision
1, clauses (3) to (12) (11) or (14) (13) to (18)
(17), the
4.19 contractor, subcontractor, or
builder must furnish to the refund applicant a statement including
4.20 the cost of the exempt items
and the taxes paid on the items unless otherwise specifically
4.21 provided by this subdivision.
The provisions of sections 289A.40 and 289A.50 apply to
4.22 refunds under this section.
4.23 (b) An applicant may not file
more than two applications per calendar year for refunds
4.24 for taxes paid on capital
equipment exempt under section 297A.68, subdivision 5.
4.25 EFFECTIVE DATE. This
section is effective July 1, 2026.
4.26 Sec. 6. REPEALER.
4.27 (a) Laws 2025, First Special Session chapter 10, article 7,
section 8, is repealed.
4.28 (b) Minnesota Statutes
2025 Supplement, section 297A.68, subdivision 42, is repealed.
4.29 EFFECTIVE DATE. This
section is effective July 1, 2026.
APPENDIX
Repealed Minnesota Statutes:
26-08520
297A.68 BUSINESS EXEMPTIONS.Subd. 42.Data centers.
(a) Purchases of enterprise
information technology equipment and computer software for use in a qualified
data center, a qualified refurbished data center, or a qualified large-scale
data center are exempt, except that computer software maintenance agreements
are exempt for purchases made after June 30, 2013. The tax on purchases exempt
under this paragraph must be imposed and collected as if the rate under section
297A.62, subdivision 1, applied, and then refunded after June 30, 2013, in the
manner provided in section 297A.75. This exemption includes enterprise
information technology equipment and computer software purchased to replace or
upgrade enterprise information technology equipment and computer software in a
qualified data center, a qualified refurbished data center, or a qualified
large-scale data center.
(b) For purposes of this
subdivision, "qualified data center" means a facility in Minnesota:
(1) that is comprised of one or
more buildings that consist in the aggregate of at least 25,000 square feet,
and that are located on a single parcel or on contiguous parcels, where the
total cost of construction or refurbishment, investment in enterprise
information technology equipment, and computer software is at least $30,000,000
within a 48-month period. The 48-month period begins no sooner than July 1,
2012, except that costs for computer software maintenance agreements purchased
before July 1, 2013, are not included in determining if the $30,000,000
threshold has been met;
(2) that is constructed or
substantially refurbished after June 30, 2012, where "substantially
refurbished" means that at least 25,000 square feet have been rebuilt or
modified, including:
(i) installation of enterprise
information technology equipment; environmental control, computer software, and
energy efficiency improvements; and
(ii) building improvements; and
(3) that is used to house
enterprise information technology equipment, where the facility has the
following characteristics:
(i) uninterruptible power supplies,
generator backup power, or both;
(ii) sophisticated fire suppression
and prevention systems; and
(iii) enhanced security. A facility
will be considered to have enhanced security if it has restricted access to the
facility to selected personnel; permanent security guards; video camera
surveillance; an electronic system requiring pass codes, keycards, or biometric
scans, such as hand scans and retinal or fingerprint recognition; or similar
security features.
In determining whether the facility
has the required square footage, the square footage of the following spaces
shall be included if the spaces support the operation of enterprise information
technology equipment: office space, meeting space, and mechanical and other
support facilities. For purposes of this subdivision, "computer
software" includes, but is not limited to, software utilized or loaded at
a qualified data center, qualified refurbished data center, or qualified
large-scale data center, including maintenance, licensing, and software
customization.
(c) For purposes of this
subdivision, a "qualified refurbished data center" means an existing
facility that qualifies as a data center under paragraph (b), clauses (2) and
(3), but that is comprised of one or more buildings that consist in the
aggregate of at least 25,000 square feet, and that are located on a single
parcel or contiguous parcels, where the total cost of construction or
refurbishment, investment in enterprise information technology equipment, and
computer software is at least $50,000,000 within a 24-month period.
(d) For purposes of this
subdivision, "enterprise information technology equipment" means
computers and equipment supporting computing, networking, or data storage,
including servers and routers. It includes, but is not limited to: cooling
systems, cooling towers, and other temperature control infrastructure; power
infrastructure for transformation, distribution, or management of electricity
used for the maintenance and operation of a qualified data center or qualified
refurbished data center, including but not limited to exterior dedicated
business-owned substations, backup power generation systems, battery systems,
and related infrastructure; and racking systems, cabling, and trays, which are
necessary for the maintenance and operation of the qualified data center,
qualified refurbished data center, or qualified large-scale data center.
(e) For purposes of this
subdivision, "qualified large-scale data center" means a facility in
Minnesota:
(1) that is comprised of one or
more buildings connected to each other by fiber and associated equipment that
consist in the aggregate of at least 25,000 square feet, and that are located
in one physical location or multiple locations; and
(2) for which the total cost of
construction or refurbishment, investment in enterprise information technology
equipment, and computer software is at least $250,000,000 collectively by the
facility and its tenants within a 60-month period beginning after June 30,
2025.
(f) A qualified data center,
qualified large-scale data center, or qualified refurbished data center may
claim the exemptions in this subdivision for purchases made within 35 years of
the date of its first purchase qualifying for the exemption under paragraph (a).
(g) The exemption in this
subdivision is allowed for qualified data centers, qualified large-scale data
centers, and qualified refurbished data centers that were certified under
paragraph (h) before July 1, 2042.
(h) The commissioner of employment
and economic development must certify to the commissioner of revenue, in a
format approved by the commissioner of revenue, when a qualified data center
has met the requirements under paragraph (b), a qualified refurbished data
center has met the requirements under paragraph (c), or a qualified large-scale
data center has met the requirements under paragraph (e). The certification
must provide the following information regarding each qualified data center or
qualified refurbished data center:
(1) the total square footage
amount;
(2) the total amount of
construction or refurbishment costs and the total amount of qualifying
investments in enterprise information technology equipment and computer
software;
(3) the beginning and ending of the
applicable period under paragraph (b), (c), or (e) in which the qualifying
expenditures and purchases under clause (2) were made, but in no case shall the
period begin before July 1, 2012; and
(4) the date upon which the
qualified data center first met the requirements under paragraph (b), a
qualified refurbished data center first met the requirements under paragraph
(c), or a qualified large-scale data center first met the requirements under
paragraph (e).
(i) Any refund for sales tax paid
on qualifying purchases under this subdivision must not be issued unless the
commissioner of revenue has received the certification required under paragraph
(h) issued by the commissioner of employment and economic development.
(j) The commissioner of employment
and economic development must annually notify the commissioner of revenue of
the qualified data centers that are projected to meet the requirements under
paragraph (b), the qualified refurbished data centers that are projected to
meet the requirements under paragraph (c), and the qualified large-scale data
centers that are projected to meet the requirements under paragraph (e), in
each of the next four years. The notification must provide the information
required under paragraph (h), clauses (1) to (4), for each qualified data
center, qualified refurbished data center, or qualified large-scale data
center.
(k) Laborers and mechanics
performing work to construct or refurbish qualified large-scale data centers
must be paid the prevailing wage rate for the work as defined in section
177.42, subdivision 6. Work performed to construct or refurbish qualified
large-scale data centers is subject to the requirements and enforcement
provisions of sections 177.27, 177.30, 177.32, and 177.41 to 177.45. For
purposes of this paragraph, "refurbish" does not include maintenance
or equipment refreshment or replacement. The commissioner of employment and
economic development must not certify a qualified large-scale data center under
paragraph (h) unless the entity seeking an exemption certifies to the
commissioner of employment and economic development that it has complied with
this paragraph for all covered work after June 30, 2025.
(l) Within three years after being
placed in service, a qualified large-scale data center must certify to the
commissioner of commerce that the facility has attained certification under one
or more of the following sustainable design or green building standards:
(1) BREEAM for new construction or
BREEAM in-use;
(2) Energy Star;
(3) Envision;
(4) ISO 50001-energy management;
(5) LEED for building design and
construction or LEED for operations and maintenance;
(6) green globes for new construction
or green globes for existing buildings;
(7) UL 3223; or
(8) other reasonable standards
approved by the commissioner of employment and economic development.
(m) Notwithstanding section
289A.38, subdivision 1, the amount of the exemption allowed to a qualified
large-scale data center must be repaid to the commissioner of revenue if the
commissioner of commerce determines that a qualified large-scale data center
has not met the requirements under paragraph (l). Nothing in this paragraph
prohibits the commissioner of revenue from making an assessment of tax,
interest, or penalties if the commissioner of revenue determines that sales to
and purchases made by a qualified large-scale data center do not qualify for
the exemption under this subdivision.
Repealed Minnesota Session Laws:
26-08520
Laws 2025, First Special Session chapter 10, article 7, section 8
Sec. 8. DIRECTION TO COMMISSIONER OF MANAGEMENT AND BUDGET; CONTINGENT
REDUCTION IN SPECIAL EDUCATION AID APPROPRIATIONS.
(a) When preparing the forecast for
state revenues and expenditures under Minnesota Statutes, section 16A.103, the
commissioner of management and budget must assume a $250,000,000 reduction in
the appropriations for special education aid for the biennium beginning July 1,
2027, and for each subsequent biennium, until the end of the legislative
session that enacts a budget for the Department of Education for the biennium
beginning July 1, 2027.
(b) Upon enactment of a budget for
the Department of Education for the biennium beginning July 1, 2027, the
legislature must identify enacted provisions that were recommended by or based
on the recommendation of the Blue Ribbon Commission on Special Education.
(c) To the extent the net savings
attributable to the provisions in paragraph (b) are less than $250,000,000 for
the biennium beginning July 1, 2027, and for each subsequent biennium, the
commissioner of education must reduce the special education cross subsidy aid
factor under Minnesota Statutes, section 125A.76, subdivision 2e, paragraph
(b), as necessary to reduce biennial
appropriations for special education aid by an amount equal to the difference
between the savings identified in paragraph (b) and the $250,000,000 of
biennial savings assumed in paragraph (a). The commissioner of education must
notify the chairs and ranking minority members of the legislative committees
with jurisdiction over kindergarten through grade 12 education of any reduction
in the cross subsidy aid factor under this paragraph.